    Hi,

    I want to use 1 core 100% in 1 project and 3 other projects on the other core. Is this possible?
    It's because I want to set up Einstein or Seti 100% because they have long working hours.

    Regards


  2. #2
    Super Moderator tutta55 is a splendid one to beholdtutta55 is a splendid one to beholdtutta55 is a splendid one to beholdtutta55 is a splendid one to beholdtutta55 is a splendid one to beholdtutta55 is a splendid one to beholdtutta55 is a splendid one to behold tutta55's Avatar
    Join Date
    Nov 2004
    Location
    Melle
    Age
    52
    Posts
    4,455
    Rep Power
    42

    Default Re: multiple cores and multiple projects

    There is no possibility to assign a project to a specific core. If you have 2 cores, then a WU will run on one, and a second WU on the other. Of course if you make your resources shares 75% and 25%, on average the effect will be what you want.

  3. #3
    BMF Moderator PowerToTheUsers is a jewel in the roughPowerToTheUsers is a jewel in the roughPowerToTheUsers is a jewel in the rough PowerToTheUsers's Avatar
    Join Date
    Oct 2006
    Location
    Wilrijk/Edegem
    Age
    30
    Posts
    669
    Rep Power
    14

    Default Re: multiple cores and multiple projects

    Not always....

    I already mentioned this somewhere else on this forum: I have multiple projects on multiple cores, ans sometimes a core becomes unused. Some projects let their work get attached to one core (CPU affinity). Say your CPDN-wu gets atached to core 1. All the time when it's still running, it will stay on core 1. Say you combine CPDN with Einstein. When CPDN gets paused, an Einstein-wu gets started, and also gets attached to core 1. No problem: there's only 1 project active, all cores are in use with (2-4-8-...) wu's from Einstein. Then the wu on core 3 ends and there is no new work, or boinc decides to get back to CPDN. Then the CPDN-wu from core 1 gets started. So core 1 will do projects (2 wu's) at the same time, leaving core 3 unused...

    I'm not entirely sure this is how this gets triggered, but I have seen it on my octacore a few times: 2 wu's on the same core and another core unused, always with 2 or more projects. Having only 1 project didn't give any problems (yet).

  4. #4
    Respected member kdr_98 is a glorious beacon of lightkdr_98 is a glorious beacon of lightkdr_98 is a glorious beacon of lightkdr_98 is a glorious beacon of lightkdr_98 is a glorious beacon of light kdr_98's Avatar
    Join Date
    Nov 2006
    Location
    Eeklo
    Age
    43
    Posts
    1,074
    Rep Power
    20

    Default Re: multiple cores and multiple projects

    If you have 2 projects for a dual core it's possible since in your project profile you can set-up use maximum 1 core.

    But if you have 3 projects , you can't garantee that 1 project will be fixed on 1 core , and the other will switch with each other on the other core.
    All depends on the resource share ( % also in your profile) , and the time-limit for that WU.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

     

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts